Leesville Storage, Durham NC
- Project Overview
- Location: Leesville Rd, Durham, NC
- Project Type: Commercial Self-Storage Facility
- Core Services: Mass Grading, Building Pad Prep, Wet Utilities, Commercial Stormwater Management, Asphalt & Concrete Subgrade Prep
- Execution Highlights: Delivered 100% On Time and On Budget with First-Pass Municipal Approval
01
Key Scope & Execution Highlights
For the Leesville Storage commercial facility in Durham, NC, Pine Siteworks provided turnkey heavy civil site development engineered to strict commercial standards. Commercial storage projects require rapid site turnover, tight pad tolerances, and seamless utility connections. By integrating civil engineering oversight with disciplined field execution, our team completed all earthwork, underground utilities, and base preparation strictly on schedule and within budget—delivering a builder-ready site with zero costly delays.
02
Disciplined Schedule & Budget Management
Pine Siteworks executed mass clearing, site demolition, and precision grading to establish stable building pads for the storage structures. Utilizing 3D GPS grading technology, we ensured subgrade compaction met exact engineering specifications on the first pass. By balancing earthwork quantities on-site and controlling material logistics, we kept site prep moving at peak efficiency—ensuring the project stayed strictly on time and within budget.
03
Commercial Utility & Stormwater Management
Commercial storage sites require robust stormwater retention and heavy-duty utility connections. Pine Siteworks installed deep wet utility lines, underground retention structures, and surface drainage controls designed to manage post-development runoff. Our proactive coordination with local inspectors ensured rapid approvals and seamless utility tie-ins without impacting the critical path.
